Skip to main content

Rates and Fees

DEVELOPMENT SERVICES RATES AND FEES

The District charges various rates and fees for utilization of District equipment, materials, and services in accordance with applicable law.

Development Services Rates and Fees - Effective January 18, 2023

Development ServicesRate
Feasibility StudyTime and materials
Field Inspection$90.00 per inspection
Fire Flow Test $80.00 each
Mainline Construction Inspection (0 - 1,200 feet)$525.00+$262.50 administrative fee
Mainline Construction Inspection (1,201 - 2,500 feet)$900.00+$450.00 administrative fee
Mainline Construction Inspection (2,501 - 5,000 feet)$1,440.00+$720.00 administrative fee
Mainline Construction Inspection (5,001 - 10,000 feet)$2,200.00+$1,100 administrative fee
Mainline Plan Check (0 - 1,200 feet)$525.00+$262.50 administrative fee
Mainline Plan Check (1,201 - 2,500 feet)$900+$450.00 administrative fee
Mainline Plan Check (2,501 - 5,000 feet)$1,440.00+$720.00 administrative fee
Mainline Plan Check (5,001 - 10,000 feet)$2,200.00+$1,100.00 administrative fee
Meter Installation (does not include connection fee)Parts + Materials + Labor
Service Lateral & Meter Installation$2,517.12 per 1" meter (estimated). Varies for meter larger than 1"
Water Standby Fee$20.00/acre per year 
Water Availability (Will Serve) Letter $80.00/parcel per letter
Water Connection Permit Fee$50.00/connection
Equipment/MaterialsRate
MaterialsActual Cost 
3" Suction Hose$15.00/use
4" Mud Pump$33.00/hour
Air Compressor with Accessories$30.00/hour
Backhoe$68.00/hour
Bore Machine$27.00/hour
Dump Truck - 10 Wheel$120.00/hour
Pickup/Utility Truck $31.75/hour
Skid Steer$68.00/hour
Unspecified EquipmentRental Cost
Utility Trailer$33.00/use
Vactor$33.00/hour
Welder$33.00/hour
Temporary Meter Rental & User ChargesRate
Meter Fee1.5 times the regular monthly meter charge
Water Use FeeHighest tiered rate